• Email:[email protected] WhatsApp:0086 18733132385
  • Gold Flotation Production Line

    Gold Flotation Production Line

    Flotation is widely used in gold Processing. In China, 80% rock gold is Processed by flotation. Flotation…

    Manganese Ore Magnetic Separation Production Line

    Manganese Ore Magnetic Separation Production Line

    Manganese ore belongs to the weak magnetic minerals, which can be recovered by high-intensity magnetic…

    Graphite Ore Beneficiation Process

    Graphite Ore Beneficiation Process

    Xinhai usually applying multi-stage grinding process to protect graphite flake from damaged. Applying…

    Gold Cil Processing Line

    Gold Cil Processing Line

    Gold CIL (Carbon in Leach) Process is an efficient design of extracting and recovering gold from its…

    Cu Pb Zn Dressing Process

    Cu Pb Zn Dressing Process

    Adopting mixed flotation-concentrate regrinding Process can reduce the grinding cost, and be easy to…

    Dolomite Mining Process

    Dolomite Mining Process

    Dolomite mining process is the solution of separating dolomite concentrate from Dolomite raw ore. Based…

    quantity of aggregates required for m concrete

  • How to estimate the quantity of cement sand aggregate in 1

    Hi We use minimum grade of concrete for RCC = M20 For M20 GRADE = 1:1.5:3 Volume of Concrete = L x B x D= 1 cum Wet Volume of concrete = 1 cum Dry volume of concrete = 1.52 x 1 = 1.52 cum Ratio = 1:1.5:3 = 5.5 * Cement = 1.52[ 1/(1+1.5+3)]

    Live Chat
  • Calculate Quantities of Materials for Concrete Cement

    Quantities of materials for concrete such as cement sand and aggregates for production of required quantity of concrete of given mix proportions such as 1:2:4 (M15) 1:1.5 3 (M20) 1:1:2 (M25) can be calculated by absolute volume method.

    Live Chat
  • How to Calculate Cement Sand and Coarse Aggregate

    In this post we are going to explain How to Calculate Concrete Volume and its ingredients? How to Calculate Concrete Volume? If it is a volume then we know there must be 3 dimensions Length Height Width or Breadth We covered some Basic Surface Area and Volume Formulas For Slab If we need to calculate the concrete volume

    Live Chat
  • How to Calculate Cement Sand and Aggregate required for 1

    The proportions of cement sand coarse aggregate and water plays an important role in determining the fresh and hardended properties of concrete So care should be taken while calculating the amount of Cement Sand and Aggregate required for 1 Cubic meter of Concrete Method1 DLBD method to determine material requirement for 1 Cum concrete The DLBD (Dry

    Live Chat
  • What are the quantities of cement sand aggregate required

    Do check the below excel/image to get an idea of how to calculate the cement sand aggregate proportion in 1 m3 of concrete for M15 M20 and M25 Thanks !!!

    Live Chat
  • Quantity Of Cement Sand Aggregates For 1000 sq ft Slab

    Quantity Of Cement Sand Aggregates For 1000 sq ft Slab? To calculate the quantity of cement sand and aggregates required for a flat slab first we need to calculate the volume Area of flat slab = 1000 sq.ft =93 sq m The minimum thickness provided

    Live Chat